Buying commercial property in Flanders: what you take on
When you buy a commercial building in Flanders, three obligations come with it: an energy certificate for non-residential buildings (EPC NR), a renovation obligation that runs for six years from the notarial deed, and an asbestos certificate for buildings from before 2001. This page lists what applies, from which date, and what it costs to ignore. It covers the Flemish Region only. Brussels and Wallonia have their own rules.

At a glance
| Obligation | Applies when | Deadline or date |
|---|---|---|
| EPC NR available | The unit is offered for sale or to let | Since 1 May 2023; handed to the buyer by the deed at the latest |
| EPC NR for every large non-residential unit | Always, also without a sale or letting | 1,000 m² and more: since 1 January 2025. Smaller large units: since 1 January 2026 |
| Minimum label E | Every large non-residential unit | From 1 January 2030 (public buildings: 1 January 2028) |
| Renovation obligation | Full ownership passes by notarial deed, or a long lease or building right is created or transferred | Six years from the deed |
| Asbestos certificate | Transfer of a building from before 2001 | At the signing of the sale agreement |
| Asbestos certificate for every building from before 2001 | Always | From 2032 |
1. The energy certificate for non-residential buildings (EPC NR)
The seller must have an EPC NR when the unit is put on the market, and must hand it to the buyer by the notarial deed at the latest. Since 1 January 2026 every large non-residential unit needs one, whether or not it is sold or let.
A unit is small only if it meets three conditions: its main use is non-residential, its usable floor area is 500 m² at most, and it is not part of a larger non-residential whole. That whole may not exceed 1,000 m² within one building and may not contain a unit above 500 m². A unit that fails one of the three is large.
From 1 January 2030 every large unit must show a valid EPC NR with at least label E. Temporary constructions in use for less than two years and small detached units below 50 m² are exempt.
2. The renovation obligation
Since 1 January 2022 the new owner of a non-residential unit has six years from the notarial deed to do two things.
Carry out a minimum package of measures:
- Roof: if the insulation does not reach an R-value of 0.75 m²K/W, insulate to a U-value of 0.24 W/m²K at most.
- Glazing: replace single glazing with glazing of 1 W/m²K at most.
- Heating: replace central heat generators older than 15 years, unless the installation meets the minimum requirements for renovation.
- Cooling: replace cooling installations older than 15 years that use ozone-depleting refrigerants or refrigerants with a GWP of 2,500 or more.
Reach a minimum energy level. A large unit in a building that is transferred as a whole must reach at least 5 % renewable energy or label E, shown by an EPC NR.
The structure of the deal matters:
| Transaction | Renovation obligation? |
|---|---|
| Sale, exchange, gift or contribution to a company, in full ownership | Yes |
| Creation or transfer of a long lease (erfpacht) or building right (opstal) | Yes |
| Contribution or transfer of a branch of activity | Yes |
| Share deal | No |
| Merger, absorption, (partial) demerger | No |
| Inheritance | No, but an obligation that is already running passes to the heir |
A share deal does not start a new obligation, because the building stays with the same company. An obligation that is already running on the building keeps running.
If nothing is done, the Flemish Energy and Climate Agency (VEKA) can impose an administrative fine of 500 to 200,000 euro. The fine does not end the obligation: the agency sets a new deadline.
3. The asbestos certificate
A building from before 2001 needs an asbestos certificate when it is transferred. It must be available when the sale agreement is signed. A certified asbestos expert inspects the building without opening walls or floors, and the public waste agency OVAM issues the certificate. It is normally valid for ten years.
From 2032 every owner of a building from before 2001 must have one, also without a transfer. For the common parts of buildings in co-ownership, the association of co-owners must have a certificate by 31 December 2026.
What to ask the seller
- The EPC NR of every unit, with its label and date.
- The asbestos certificate, and the one for the common parts if there is co-ownership.
- Whether a renovation obligation is already running on the building, and since which deed.
- What has been carried out so far, with invoices.
How Alta helps
The Alta Scan
Certificates in the building passport
Frequently asked questions
Does a share deal trigger the renovation obligation?
No. Only the shareholding changes; the building stays with the same company. An obligation that was already running on the building continues.
When does the six-year period start?
On the date of the notarial deed, or on the date the long lease or building right is created. A deed signed on 1 February 2026 means the work must be done before 1 February 2032.
What if the building is sold again within the six years?
The period does not restart. The new owner must meet the requirements within the time that is left.
Does the tenant have to do anything?
Usually not. The obligation lies with the owner. One exception: a tenant who rents a shell and installed the cooling system is responsible for the measure that concerns that system.
Do these rules apply in Brussels and Wallonia?
No. Energy and environmental rules for buildings are regional in Belgium. This page covers the Flemish Region.